Electrical Supplies
Prisma medical
- Securing power distribution and monitoring solution for operating hospitals.
- Serve Group 2 medical locations — operating theatres, intensive care and catheterisation labs — where a first earth fault must not disconnect the supply. The board carries the medical isolating transformer, the insulation monitoring device and load and temperature monitoring, and alarms the theatre panel on first fault so the procedure can be completed before maintenance intervenes. The IT earthing system is what makes this possible, and it is the reason a standard TN-S board cannot simply be relabelled for theatre use.
- IEC 61439-1
- IEC 61439-2
- IEC 60364-7-710
- IEC 61557-8
- IEC 61558-2-15
- CCC
- ASEFA
More in this line
Prisma Panels
2 products
View All

